Oil Palm India Ltd

E-Tender – Design, Supply, Installation, Testing and Commissioning of a Three-Phase Decanter Centrifuge System for a 20 TPH Fresh Fruit Bunch (FFB) at Palm Oil Mill, Yeroor on Turnkey basis due on 05.06.2026, 2.30 PM

Leave A Reply

Your email address will not be published. Required fields are marked *